GWR 0-6-0PT No.9466


March 2004 Overhaul Pictures


To see a full size picture please click on the image below.




View into the smokebox with much still to fit - 28 March 2004.


Left hand firebox securing bracket fitted and new lower side cladding sheet temporarily fitted - 28 March 2004.


New corner cladding sheet being lifted into place for the first trial fit - 28 March 2004.


General view of the right hand side of the loco - 28 March 2004.


Stuffing box oil pipes - 23 March 2004.


Just taking a tank for a walk - 23 March 2004.


The cab sits in place - 23 March 2004.


Now its the turn of the cab - 23 March 2004.


The boiler sits in its proper place for the first time in over two years - 23 March 2004.


The smokebox is located on the saddle with the help of a bar - 23 March 2004.


The firebox dropping down between the frames - 23 March 2004.


Up, up and away - 23 March 2004.


Securing nuts being fitted - 23 March 2004.


Fitting the ashpan - 23 March 2004.


In daylight for the first time in nearly two years - 23 March 2004.


Look, it's stopped raining now, so you can come out - 23 March 2004.


The frames lurking in the depths of the shed - 23 March 2004.


Backhead - 23 March 2004.


Tanks being rubbed down - 23 March 2004.


Boiler and cab - 23 March 2004.


Temporary draw hook in the front buffer beam - 21 March 2004.


Top half of the cab - 21 March 2004.


The re-fitted right hand side rod and speedometer drive - 14 March 2004.


The re-fitted valve chest cover - 14 March 2004.


The re-fitted rear brake rods - 6 March 2004.



Click here to return to the overhaul pictures main page.

Click here to return to 9466 Home Page.

Please e-mail me with any questions or queries. Bruce Murray



Page updated 29 April 2004.