GWR 0-6-0PT No.9466January 2002 Overhaul PicturesTo see a full size picture please click on the image below. The right hand main steam pipe removed from the smokebox - 13 Jan 02. More plumbing removed from the cab - 13 Jan 02. General view of the loco - 13 Jan 02. Boiler Crinoline dimantled into component parts - 8 Jan 02. Left hand side firebox expansion bracket unbolted from frames - 8 Jan 02. The blower ring lying on the floor. It is upside down. The vacuum ejector exhaust connection is on the right and the blower on the left - 8 Jan 02. The ashpan spark guards removed. They stop alight ash dropping onto the track - 8 Jan 02. The blastpipe nozzle - 8 Jan 02. Click here to return to the overhaul pictures main page. Click here to return to 9466 Home Page. Please e-mail me with any questions or queries. Bruce Murray Page updated 15 February 2002 (Page layout revised). |