GWR 0-6-0PT No.9466February 2004 Overhaul PicturesTo see a full size picture please click on the image below. I am not sure this is an acceptable standard of behaviour.... - 29 February 2004. It's all fitted for the final time (1) - 29 February 2004. It's all fitted for the final time (2) - 29 February 2004. Re-furbishedvalve rod and buckle - 29 February 2004. Our lovely assistant pointing at the joint between the existing buckle and the new valve rod - 29 February 2004. A freshly annealed main steam pipe - 22 February 2004. A mystery object.... - 15 February 2004. Rog's smart design for the rocking grate starts to become reality - 15 February 2004. The junior member of the team demonstrates turning the driving axle - 15 February 2004. The main vacuum pipe, plus someone leaning on the job - 15 February 2004. The re-fitted steam heat pipe. Look at the shine on that black paint! - 8 February 2004. The re-fitted speedometer - 8 February 2004. Repainted swan neck temporarily re-fitted to assist with aligning the main vaccy pipe that are yet to be put back on the loco - 8 February 2004. Oil box to feed R/H piston and valve glands re-fitted - 1 February 2004. Shiny backhead cladding with the re-fitted lubricator - 1 February 2004. Click here to return to the overhaul pictures main page. Click here to return to 9466 Home Page. Please e-mail me with any questions or queries. Bruce Murray Page updated 11 March 2004. |